The property is buffered by adjacent land owners from the main highway. Each building was positioned on the site for security and to allow optimum access and future expansion.
The buildings were juxtaposed on the site linked by parking.
Each of the four buildings is of pre-engineered structure with standing seam metal roof and wall panels.
The buildings were positioned to allow required public access while maintaining security to the remainder of the property with carefully placed fencing